This project established/enhanced suitable aquatic habitat resulting in protection of eroding shorelines, increased angler-fish interactions, improved angler access, and enhanced recruitment of multiple fish species that will lead to improved lake health, increased wildlife-related recreation opportunities, and strengthened local economies. Eroded shorelines (1400′) were armored with 2,786 tons of rip-rap on the lake’s most highly eroded banks. The stabilization of the shoreline improved water quality, stopped erosion, and provided places for fish to spawn, feed, and rest. Rock installation was done entirely from shoreline access points around the lake. This project also included the installation of hard, woody cover in the form of approximately 30 large hardwood brush piles consisting of 5-10 trees per brush pile. Entire trees, large stumps, and large tree tops taken from Mozingo Park property were used to construct brush piles on shallow, as well as deep lake contours. Hard, woody cover provides excellent nursery sites for young-of-the-year fishes in shallow water, as well as furnishing excellent fish habitat and fish attracting structure in deeper locales that will lead to increased angler success. Details of the Mozingo Lake project were presented at the 2016 Reservoir Fisheries Habitat Partnership Annual Meeting.